Bluffton, Indiana — Serving Wells County

Getting work done for your home or business.

Painting, drywall, tile, flooring, renovations, and handyman work done with care — backed by our Satisfaction Guarantee.

Free
On-site estimates
Fully insured
9+
Years of local work
Satisfaction guaranteed
Flat
By-the-job pricing
01

Call or reach out

Call 260-580-1169 or use the contact form. Have your project type and photos ready.

02

Free estimate

We come out, assess the job, and give you a flat written price with a clear start date.

03

Work begins

50% down at start. Your space is protected and we communicate throughout the job.

04

Done right

Remainder due at completion. Cash or card. Work backed by our Satisfaction Guarantee.

Insured & guaranteed. Job Smasher carries active liability insurance and all work is backed by our Satisfaction Guarantee — if something isn’t right, we’ll make it right. Also a proud partner of the Wells County Council on Aging Senior Discount Program. View insurance certificate.

Ready to get a project started?

Free estimates, by-the-job pricing, same-week scheduling when available.

Bathroom Renovation – Tub to Walk-In Shower

Existing bathtub removed and converted to a walk-in shower using Flexstone wall panels. Installed sliding glass door system with matte black frame, Moen valve and handheld shower head, and replaced vanity with a larger unit to improve storage and layout.

Before - bathtub shower combo
Before Tub and Shower
After - walk in flexstone shower
Walk-in Shower Installed
Vanity Upgrade
Fixture detail
Vanity upgrade
Finished layout

Shower Alcove Rebuild and Enclosure Upgrade

A worn, open-framed shower alcove was rebuilt from the studs out, transforming a rough construction cavity into a bright, clean, fully finished enclosure. Fresh drywall, recessed lighting, and a new surround brought modern function and polish to the space. The result is a crisp, durable shower install that feels right at home in a refreshed bathroom.

Before - shower alcove open framing
Before – shower alcove exposed with open framing
After - rebuilt finished shower enclosure
After – bright, fully finished new shower
After - updated shower framing and finish work
Finished alcove with clean drywall and trim
After - new shower lighting installation
Recessed lighting brightens the new enclosure
After - finished shower base and surround integration
Smooth surround and shower base fully tied in
After - clean finished shower enclosure front view
Front view of the completed shower renovation

Kitchen Renovation

This kitchen was stripped back to the bare bones and rebuilt into a clean, modern space. Floor-to-ceiling white subway tile brightens the room, while a mosaic inset adds a bold focal point that ties the whole design together.

Before — dated kitchen stripped to studs
Before — kitchen gutted to the bones
After — modern white subway tile kitchen remodel
After — clean white subway tile from floor to ceiling
After — wide angle of new white tile kitchen
Wide angle view of the finished kitchen
After — mosaic tile centerpiece installed
Mosaic tile centerpiece as the focal point
After — detailed look at tile work and finish
After of tile work
After — kitchen layout with new finishes
Full layout with all new finishes installed